- The US Department of Energy puts the levelized cost of clean hydrogen from current PEM electrolyzers at about US$5 to US$7 per kg, in 2022 dollars and before subsidies.
- Electricity dominates the result. A PEM system uses about 57 kWh of electricity per kilogram, so the power price sets most of the answer before capital cost enters the picture.
- Our worked example for a 10 MW PEM plant lands at US$5.17 per kg, and the same method shows why a solar-only plant at low utilization costs far more per kilogram.
Levelized cost of hydrogen (LCOH): the average cost of producing one kilogram of hydrogen over a plant’s full operating life, calculated by discounting every cost the plant incurs and dividing by the discounted kilograms it produces. It is a production cost. It is not a market price.
The levelized cost of hydrogen answers a simple question with a complicated calculation: what does each kilogram of hydrogen cost to produce over the whole life of a plant, once every dollar spent is counted and spread across every kilogram made? The figure bundles the electrolyzer and its installation, the electricity that runs it, routine upkeep, and the replacement stacks the plant will need before it retires. Because each of those inputs can be chosen differently, two published figures can look alike while describing very different plants.
That mismatch is the reason the number needs an explainer rather than a lookup table. A headline figure of five dollars per kilogram tells a reader almost nothing until the inputs behind it are visible. The discount rate, the capacity factor, the electricity price, and the boundary of what counts as a cost all sit inside the number, and each one can move it by a dollar or more per kilogram. The sections below open up the formula, price each input with published data, and then run a worked example so readers can test any quoted figure against their own arithmetic.
The LCOH formula in plain terms
The LCOH formula divides the lifetime cost of a hydrogen plant by the lifetime hydrogen it produces, with both sides discounted to present value. In the form the US Department of Energy uses, the numerator adds up capital cost, operating cost, maintenance, and stack replacements year by year, and each year is divided by a discount factor that shrinks future dollars to present dollars. The denominator does the same for kilograms produced. The result is the constant price per kilogram that would pay back every cost and deliver the target return on the investment.
A shorter version of the same idea works for back-of-envelope checks. Annualize the capital cost with a capital recovery factor, add fixed operating cost and the annualized cost of stack replacements, divide that sum by the kilograms produced in a year, then add the electricity cost per kilogram. The capital recovery factor turns a lump sum into an equal annual payment, and it depends on two inputs only: the discount rate and the plant life. At an 8 percent discount rate over 25 years, the factor is 0.09368, which means each US$1 million of capital costs about US$93,680 per year. At a 10 percent discount rate over 30 years, the factor is 0.1061.
The discount rate deserves attention because it decides how much weight the future carries. A high discount rate shrinks the value of hydrogen produced late in a plant’s life, which raises the cost per kilogram for capital-heavy projects. The DOE analysis behind Record 24005 used financial assumptions that produce about a 10 percent nominal weighted average cost of capital. The worked example below uses 8 percent instead, and states that choice openly, so readers can see the effect rather than inherit it.
The standard US method for this calculation is the DOE Hydrogen Analysis (H2A) production model, a discounted cash-flow model that the DOE Hydrogen and Fuel Cell Technologies Office has used for hydrogen cost benchmarking since the model was first developed. Record 24005 ran its scenarios through H2A-Lite, a streamlined version of the same model, using a 30-year electrolyzer system life, a 50,000 kg per day plant, and peer-reviewed inputs from the DOE H2NEW Consortium and domestic electrolyzer manufacturers.
What goes into each input
Five inputs carry almost all of the result. The rest, including water and minor consumables, amounts to rounding. Each input below carries the published value behind it, so readers can check the worked example line by line.
Installed capital cost
The DOE baseline for installed PEM electrolyzer capital cost is about US$2,000 per kW in 2022 dollars, a figure vetted by domestic manufacturers and consistent with the literature range of US$1,400 to US$2,500 per kW that Record 24005 cites. Installation is a large share of that number. The record notes that installation and indirect costs approximately equal the uninstalled system cost for early market deployments, so the stack itself is roughly half of the installed price and the balance of plant, piping, power electronics, and construction make up the rest. Large systems above 100 MW run cheaper per kW than a 1 MW system because the balance of plant is used more efficiently.
The International Energy Agency gives a similar picture in its Global Hydrogen Review 2026. Its assumptions annex puts global average electrolyzer capital cost at US$1,920 to US$2,500 per kWe in 2025, falling to US$1,440 to US$1,870 per kWe by 2030 under the Stated Policies Scenario. The same annex puts Chinese electrolyzer capital cost far lower, at US$550 to US$1,100 per kWe in 2025. That gap is one reason a Chinese project can quote a lower LCOH than a US or European project with identical electricity prices.
Electricity price and consumption
Electricity is the largest single cost in most LCOH figures. A PEM system in the DOE analysis consumes about 57 kWh of electricity per kilogram of hydrogen on average across its life, including both the stack and the balance of plant. Multiply that consumption by the electricity price and the scale of the effect is immediate. At US$0.03 per kWh, electricity alone costs about US$1.71 per kilogram. At US$0.08 per kWh, it costs about US$4.56 per kilogram. No other input moves the answer that fast, which is why the cheapest hydrogen in every published comparison sits next to the cheapest power.
The DOE scenarios use renewable electricity costs of roughly US$0.03 per kWh. The IEA annex gives the underlying power costs for 2025: solar PV in North America at US$37 per MWh and onshore wind in North America at US$36 per MWh. Those are levelized costs of electricity for good resource conditions, and real power purchase agreement prices vary widely around them. A project that buys grid power at average industrial rates pays far more, and the DOE grid-average scenario shows the result.
Capacity factor
Capacity factor is the share of the year the electrolyzer runs at rated output, and it decides how many kilograms share the fixed capital cost. The DOE scenarios cover capacity factors from 50 to 75 percent for renewable-powered plants. A hybrid wind and solar plant reaches 74 percent because wind and sun peak at different times. Land-based wind alone reaches 51 percent in the best wind class. Hydropower reaches 50 percent in the DOE scenario. Solar alone, at about 35 percent, pushes the DOE modeled cost to about US$9 per kg at US$2,000 per kW of installed capital.
The IEA annex shows why single-source plants struggle on this input. Solar PV in North America runs about 2,480 full-load hours a year, which is a 28 percent capacity factor. Onshore wind in North America runs about 3,640 full-load hours, a 42 percent capacity factor. A plant tied to one of those sources alone either accepts a low capacity factor or pays for storage and oversized generation to fill the gaps, and both choices raise the cost per kilogram.
Discount rate and plant life
The DOE analysis assumes a 30-year electrolyzer system life and financial terms that produce about a 10 percent nominal weighted average cost of capital, with a real return on equity of 10.89 percent, a debt-to-equity ratio of 0.62, and a 5 percent interest rate. It also assumes the system depreciates over 20 years under the MACRS method and a total income tax rate of 25.74 percent. The worked example below uses a 25-year life and an 8 percent discount rate, which is closer to the terms a corporate buyer with contracted power might face, and the difference is flagged wherever it matters.
Fixed operating cost and stack replacement
Fixed annual operating costs in the DOE analysis are assumed to be 5 percent of total installed capital cost per year, consistent with the default H2A assumptions. Stack replacements cost 11 percent of total installed capital cost and fall due every 40,000 operating hours, so the interval in years depends on the capacity factor. At 50 percent capacity factor, 40,000 operating hours take about nine years to accumulate. At 97 percent, the same stack life is used up in under five years. The IEA annex uses a slightly different pair of assumptions, with fixed operating cost at 3 percent of capital cost and a 50,000-hour stack lifetime, noting that stack life can reach up to 95,000 hours.
System boundary and dollar year
Two bookkeeping choices hide inside every published LCOH figure. The first is the system boundary. The DOE figures cover hydrogen production only. Compression, storage, distribution, and dispensing costs are not included, so the cost of getting hydrogen to a truck or a turbine sits on top of the quoted number. The second is the dollar year. The DOE figures are stated in 2022 dollars, and the record is explicit that incentives such as the clean hydrogen production tax credit and the renewable energy production tax credit are not considered. A figure that includes subsidies, or one that covers delivery as well as production, will look different from the DOE number for reasons that have nothing to do with the plant itself.

A worked example puts a 10 MW PEM plant at US$5.17 per kg
The calculation below is a Joule Post calculation, built from the DOE and IEA inputs above with a simplified capital recovery method. It leaves out income tax and depreciation timing, so it runs below the DOE full H2A results for the same inputs, and that gap is shown in the comparison table that follows. The value of the exercise is not the final number. It is the way each input shows up as a separate line, so a reader can change one input and watch the answer move.
| Input | Value | Source |
|---|---|---|
| Electrolyzer size | 10 MW | Joule Post assumption |
| Installed capital cost | US$2,000 per kW (US$20 million total) | DOE Record 24005 baseline |
| Electricity price | US$0.04 per kWh | Joule Post assumption |
| Capacity factor | 70% | Joule Post assumption |
| System electricity use | 57 kWh per kg | DOE Record 24005, Table 1 |
| Plant life | 25 years | Joule Post assumption |
| Discount rate | 8% | Joule Post assumption |
| Fixed operating cost | 5% of capital cost per year | DOE Record 24005, H2A default |
| Stack replacement | 11% of capital cost every 40,000 operating hours | DOE Record 24005, H2A default |
Annual output comes first. A 10 MW plant running 70 percent of the year operates for 6,132 hours and consumes 61,320,000 kWh of electricity. At 57 kWh per kilogram, that produces 1,075,789 kg of hydrogen per year. Capital is annualized with a capital recovery factor of 0.09368 at 8 percent over 25 years, which turns the US$20 million of capital into US$1,873,600 per year, or US$1.74 per kilogram. Electricity costs US$2.28 per kilogram, from 57 kWh multiplied by US$0.04 per kWh. Fixed operating cost is US$1 million per year, or US$0.93 per kilogram. Stack replacements fall due in years 7, 13, and 20 at 40,000-hour intervals, each costing US$2.2 million. Discounted at 8 percent and annualized, they add US$0.22 per kilogram.
| Cost component | Annual cost | Cost per kg | Share |
|---|---|---|---|
| Capital (annualized) | US$1,873,600 | US$1.74 | 34% |
| Electricity | US$2,452,800 | US$2.28 | 44% |
| Fixed operating cost | US$1,000,000 | US$0.93 | 18% |
| Stack replacement (annualized) | US$240,254 | US$0.22 | 4% |
| Total LCOH | US$5,566,654 | US$5.17 | 100% |
Electricity is the largest line at 44 percent of the total, and capital is second at 34 percent. That split is the most useful fact in the whole calculation. It says that negotiating a cheaper power contract moves this plant’s cost more than negotiating a cheaper electrolyzer. A US$0.01 per kWh cut in the electricity price saves US$0.57 per kilogram, because 57 kWh multiplied by US$0.01 equals US$0.57. A US$200 per kW cut in installed capital cost, by contrast, saves about US$0.17 per kilogram at this capacity factor. Readers who want to test the arithmetic themselves can run the same inputs through the Joule Post green hydrogen LCOH estimator and compare the result.
Why two US$5 per kg quotes can describe different hydrogen
Two projects can both quote US$5 per kg and describe different hydrogen. The DOE scenarios prove the point with a single method and a single electrolyzer cost. A hybrid wind and solar plant at 74 percent capacity factor and US$0.033 per kWh comes out at US$5.20 per kg. A grid-connected plant at 97 percent capacity factor and US$0.083 per kWh comes out at US$7.50 per kg, even though it runs almost all the time. The grid plant loses on electricity price what it gains on utilization, and the two effects nearly cancel. A reader who compares only the headline figures misses both effects.
The same method run with different inputs shows how wide the honest range is. The table below repeats the DOE scenarios through the simplified calculation from the worked example, so the gap between the simplified method and the full H2A model is visible in the same rows. The simplified figures run about US$0.50 to US$1.50 per kilogram below the DOE results, mostly because the simplified method leaves out income tax and depreciation timing. The DOE model assumes a 25.74 percent total income tax rate and 20-year MACRS depreciation, and it uses about a 10 percent nominal weighted average cost of capital over a 30-year life, against 8 percent and 25 years in the simplified version.
| Scenario (DOE Record 24005) | Capacity factor | Electricity price | Simplified LCOH | DOE H2A LCOH |
|---|---|---|---|---|
| Hybrid wind and solar PV | 74% | US$0.033 per kWh | US$4.66 per kg | US$5.20 per kg |
| Land-based wind, class 1 | 51% | US$0.029 per kWh | US$5.52 per kg | US$6.40 per kg |
| Hydropower | 50% | US$0.034 per kWh | US$5.88 per kg | US$6.70 per kg |
| Utility-scale solar PV | 35% | US$0.036 per kWh | US$7.54 per kg | about US$9 per kg |
| Grid average | 97% | US$0.083 per kWh | US$6.92 per kg | US$7.50 per kg |
The solar row carries the clearest warning in the table. Solar power is cheap per kilowatt-hour, and solar capacity factors are low, and the second fact wins. A solar-only electrolyzer at 35 percent capacity factor spreads its capital cost over far fewer kilograms, which is why the DOE modeled cost reaches about US$9 per kg even though the electricity itself costs only US$0.036 per kWh. The hybrid row shows the fix. Pairing wind and solar lifts the capacity factor to 74 percent, and the cost falls to US$5.20 per kg on the same capital cost. Geography matters just as much. The IEA annex puts Chinese electrolyzer capital cost at US$550 to US$1,100 per kWe against a global average of US$1,920 to US$2,500 per kWe, so a Chinese project starts the calculation with a capital line less than half the size of a US or European one.
None of this makes any single figure wrong. It makes the figure incomplete without its inputs. A quote that states the dollar year, the subsidy treatment, the system boundary, the capacity factor, the electricity price, and the discount rate can be checked. A quote that states only the dollars per kilogram cannot, and that is the practical test readers should apply before repeating a number.
DOE and IEA benchmarks side by side
The DOE range of about US$5 to US$7 per kg for current PEM electrolyzers, in 2022 dollars and without subsidies, is the most quoted US benchmark, and it holds up against the IEA inputs. The IEA global average electrolyzer capital cost of US$1,920 to US$2,500 per kWe in 2025 brackets the DOE baseline of US$2,000 per kW. The IEA efficiency of 63 percent on a lower heating value basis is consistent with the DOE system consumption of about 57 kWh per kilogram. The two institutions use different methods and different dollar years, and they still land in the same neighborhood, which is a better sign than either figure alone.
Both sources also point in the same direction for the future. The DOE record frames its results against the cost target of US$2 per kg by 2026 set by the Clean Hydrogen Electrolysis Program in the Bipartisan Infrastructure Law, and ultimately toward the Hydrogen Shot target of US$1 per kg by 2031. The IEA annex shows the mechanism for getting there: electrolyzer capital cost falling to US$1,440 to US$1,870 per kWe by 2030 under the Stated Policies Scenario, with Chinese costs falling to US$450 to US$910 per kWe. The record itself is candid that costs will fall as capital costs and power prices decline and as capacity factors and efficiencies rise, and that the single-source renewable cases are conservative estimates because optimal siting and integration were not modeled.
For context on where the technology sits, readers should know what the color labels mean before they compare prices across them. Our grey, blue and green hydrogen explainer sets out the production methods behind each label, and the equipment choice behind the numbers here is covered in our PEM versus alkaline electrolyzer comparison. Country-level price data, which is a different question from the cost of production, is in our green hydrogen price per kilogram by country guide.
What LCOH leaves out of the price a buyer pays
The most common mistake with LCOH is treating it as the price a buyer pays. It is not. LCOH is the cost of producing hydrogen at the plant gate, before compression, storage, transport, and dispensing, and before any margin for the seller. The DOE figures state this boundary plainly. A buyer who needs hydrogen delivered to a refueling station or an industrial site pays the production cost plus every step after it, and those steps can add substantially to the delivered price. Storage and transport are a separate engineering problem, covered in our guide to how hydrogen is stored and transported.
The same distinction applies in reverse. A producer who receives a subsidy does not face the unsubsidized cost. The DOE figures exclude incentives such as the clean hydrogen production tax credit, so a project that qualifies for support can sell below the published LCOH and still cover its costs. That is the intended effect of the subsidy, and it is also why two projects with identical plants can report different effective costs. The subsidy belongs in the comparison as a separate line, kept visible outside the headline figure.
The practical consequence is that LCOH is a tool for comparing production options, and it works as a benchmark rather than a price tag. It answers whether a wind-powered electrolyzer beats a grid-powered one, whether a hybrid plant beats a solar-only one, and whether a Chinese-built system beats a European-built one at the same power price. It does not answer what hydrogen will cost at the pump, in a truck, or in a steel plant. Those answers need the delivery chain added on top, and the delivery chain has its own cost structure. Hydrogen trucks illustrate the point from the demand side: our hydrogen versus battery truck comparison shows that the fuel cost per kilometer is what decides the vehicle choice, rather than the production cost per kilogram.
How to read any LCOH figure in five checks
Any published LCOH figure can be tested in under a minute with five questions. First, what dollar year is it stated in, and has inflation been accounted for since? The DOE figures are in 2022 dollars, and a 2026 figure in current dollars will read higher for that reason alone. Second, does it include subsidies or exclude them? A subsidized figure and an unsubsidized figure are different numbers, and the DOE record excludes them. Third, what is the system boundary? Production only, or production plus compression, storage, and delivery? Fourth, what capacity factor and electricity price were assumed, and are they stated at all? A figure with no capacity factor stated is a figure that cannot be checked. Fifth, what discount rate and plant life were used? A 5 percent discount rate over 30 years and a 12 percent rate over 20 years produce very different answers from the same plant.
A figure that passes all five checks is worth quoting. A figure that fails two or more is worth setting aside until its inputs appear. The worked example above gives readers the arithmetic to run the check themselves, and the Joule Post LCOH estimator runs the same calculation with adjustable inputs for any plant configuration.
Frequently asked questions
What is the levelized cost of hydrogen?
The levelized cost of hydrogen is the average cost of producing one kilogram of hydrogen over a plant’s full operating life, with every cost discounted to present value and divided by the discounted kilograms produced. The DOE puts the figure for current PEM electrolyzers at about US$5 to US$7 per kg in 2022 dollars, before subsidies, using renewable electricity at roughly US$0.03 per kWh and capacity factors of 50 to 75 percent.
How is LCOH calculated?
LCOH is calculated by discounting every cost a plant incurs over its life, including capital cost, electricity, fixed operating cost, and stack replacements, and dividing that total by the discounted kilograms of hydrogen the plant produces. The DOE H2A model performs this as a discounted cash-flow calculation. A simplified version annualizes the capital cost with a capital recovery factor, adds fixed operating cost and annualized stack replacement, divides by annual output, and adds the electricity cost per kilogram.
What is the levelized cost of hydrogen formula?
The standard form divides the net present value of all costs by the net present value of all hydrogen produced. In the simplified form, LCOH equals annualized capital cost plus fixed operating cost plus annualized stack replacement, divided by annual kilograms, plus the electricity price multiplied by kilowatt-hours per kilogram. The capital recovery factor that annualizes the capital cost depends on the discount rate and the plant life.
Why do two LCOH figures for the same technology disagree?
They usually disagree because the inputs differ. The arithmetic stays the same. The DOE scenarios show the spread with one method: a hybrid wind and solar plant at 74 percent capacity factor costs US$5.20 per kg, while a solar-only plant at about 35 percent capacity factor costs about US$9 per kg, at the same US$2,000 per kW capital cost. Dollar year, subsidy treatment, system boundary, discount rate, and plant life can each move the result by a dollar or more per kilogram.
Is LCOH the same as the price of hydrogen?
No. LCOH is the cost of producing hydrogen at the plant gate, before compression, storage, transport, dispensing, and any seller margin. The DOE figures state this boundary explicitly. A buyer pays the delivered price, which adds every step after production, while a producer receiving a subsidy can sell below the unsubsidized LCOH. LCOH is a tool for comparing production options, and it works as a benchmark rather than a price tag.
Sources
- DOE Hydrogen Program Record 24005: Clean Hydrogen Production Cost Scenarios with PEM Electrolyzer Technology — US Department of Energy, May 20, 2024
- Global Hydrogen Review 2026: Assumptions Annex — International Energy Agency, 2026